so very busy
Wednesday:
left work early, got my keys, sorted and piled up the junk in back yard, bought and installed new light bulbs, and bombed the house for bugs overnight (used 8 canisters).
Thursday:
worked all day, began cleaning around 6, decided to replace both toilets and the sink in the master bathroom instead of moving in first.
Friday:
drove all over town to several different Lowes & Home Depot stores to buy the new toilets and vanity set, picked up some paint samples, cleaned more, removed both toilets, removed the plastic sliding shutters on the closets, replaced the toilet in the main bathroom, returned the second toilet due to a cracked tank, cleared out all the rooms for the carpet cleaner coming in the morning.
Saturday:
got the carpets shampooed, removed all nails and screws from the walls, plastered nail and screw holes in walls, bought paint, repaired damage to bedroom and bathroom walls, laid new linoleum tiles in master bathroom, got my cable and internet installed, stain treated the carpet in the master bedroom, painted master bathroom until 1am, forgot it was Halloween.
Sunday:
installed new toilet and vanity w/ sink in master bathroom, had carpet in master bedroom shampooed again, removed all the junk from backyard and garage (which filled about a 10 yard bin), removed the old shelving and panels in the garage, trimmed the tree in the front yard.
Monday:
worked all day, masked and painted the master bedroom until midnight, forgot to eat diner.






